Research on Temporary Plugging Fracturing Theory and Technology
(Sprache: Englisch)
Fracturing technology is the key to the efficient development of low permeability reservoirs. However, during the fracturing of oil and gas fields, near-well formation damage increases, the water cut of oil wells increases, the conductivity of fractures...
Leider schon ausverkauft
versandkostenfrei
Buch
37.90 €
Produktdetails
Produktinformationen zu „Research on Temporary Plugging Fracturing Theory and Technology “
Klappentext zu „Research on Temporary Plugging Fracturing Theory and Technology “
Fracturing technology is the key to the efficient development of low permeability reservoirs. However, during the fracturing of oil and gas fields, near-well formation damage increases, the water cut of oil wells increases, the conductivity of fractures decreases, and the production decreases. In order to restore the productivity of oil and gas wells, temporary plugging fracturing technology is used to increase and stabilize production."Research on Temporary Plugging Fracturing Theory and Technology" is a professional book of oil and gas field development engineering. It mainly describes the research status of temporary plugging fracturing, the fracturing mechanics mechanism , the temporary plugging agent and the application of temporary plugging fracturing. It is of great significance to relevant researchers.
Autoren-Porträt von Yang Zhaozhong, Zeng Bin, Li Xiaogang
Zhaozhong, YangYang Zhaozhong, professor with the school of oil and gas engineering, received the PHD degree at Southwest Petroleum University, Chengdu, in 1996. Yang Zhaozhong is academic and technical leader in Sichuan province of china, member of Chinese Petroleum Society, member of society of petroleum engineering (SPE).
Bibliographische Angaben
- Autoren: Yang Zhaozhong , Zeng Bin , Li Xiaogang
- 2019, 152 Seiten, Maße: 22 cm, Kartoniert (TB), Englisch
- Verlag: LAP Lambert Academic Publishing
- ISBN-10: 6200240426
- ISBN-13: 9786200240422
Sprache:
Englisch
Kommentar zu "Research on Temporary Plugging Fracturing Theory and Technology"
0 Gebrauchte Artikel zu „Research on Temporary Plugging Fracturing Theory and Technology“
Zustand | Preis | Porto | Zahlung | Verkäufer | Rating |
---|
Schreiben Sie einen Kommentar zu "Research on Temporary Plugging Fracturing Theory and Technology".
Kommentar verfassen