Practice Standard for Work Breakdown Structures (ePub)
(Sprache: Englisch)
The Practice Standard for Work Breakdown Structures-Second Edition supplies project managers and team members with direction for the preliminary development and the implementation of the WBS. Consistent with A Guide to the Project Management Body of...
Leider schon ausverkauft
eBook
46.66 €
23 DeutschlandCard Punkte sammeln
- Lastschrift, Kreditkarte, Paypal, Rechnung
- Kostenloser tolino webreader
Produktdetails
Produktinformationen zu „Practice Standard for Work Breakdown Structures (ePub)“
The Practice Standard for Work Breakdown Structures-Second Edition supplies project managers and team members with direction for the preliminary development and the implementation of the WBS. Consistent with A Guide to the Project Management Body of Knowledge (PMBOK® Guide)-Third Edition, the WBS Practice Standard presents a standard application of the WBS as a project management tool. Throughout the book, the reader will learn what characteristics constitute a high-quality WBS and discover the substantial benefits of using the WBS in every-day, real-life situations.
Bibliographische Angaben
- Autor: Project Management Institute
- 2013, Englisch
- ISBN-10: 1935589466
- ISBN-13: 9781935589464
- Erscheinungsdatum: 01.08.2013
Abhängig von Bildschirmgröße und eingestellter Schriftgröße kann die Seitenzahl auf Ihrem Lesegerät variieren.
eBook Informationen
- Dateiformat: ePub
- Größe: 1.39 MB
- Mit Kopierschutz
Sprache:
Englisch
Kopierschutz
Dieses eBook können Sie uneingeschränkt auf allen Geräten der tolino Familie lesen. Zum Lesen auf sonstigen eReadern und am PC benötigen Sie eine Adobe ID.
Kommentar zu "Practice Standard for Work Breakdown Structures"
0 Gebrauchte Artikel zu „Practice Standard for Work Breakdown Structures“
Zustand | Preis | Porto | Zahlung | Verkäufer | Rating |
---|
Schreiben Sie einen Kommentar zu "Practice Standard for Work Breakdown Structures".
Kommentar verfassen